Your driveway is often the first thing people notice when they visit your home, and it’s one of the hardest-working surfaces on your property. Over time, cracks, puddles and uneven tarmac can turn it into an eyesore. That’s where a professional resin driveway installation makes all the difference.
At Resin Bound London, we combine craftsmanship, precision and high-quality materials to deliver durable, beautiful surfaces that stand the test of time.
If you’re considering an upgrade, understanding the whole installation process and timeline will help you plan with confidence. Call us today on 08082816614 or email [email protected] for expert advice.
Why The Installation Process Matters
Installing a high-quality resin driveway involves more than simply pouring resin and scattering stones. A proper resin driveway installation ensures that the correct sub-base, drainage, edging, and curing protocols are followed, which delivers the durability, permeability, and finish that clients expect. We believe “a great finish starts with good groundwork, and great communication.”
By understanding the process and timeline, you can plan your project with confidence, minimise disruption and avoid common pitfalls.
Step-By-Step Process For Your Resin Driveway Installation
Here is how we handle each stage of your project at Resin Bound London, designed for clear communication, quality and minimal hassle.
Initial Site Assessment & Design
We begin with a visit to measure the area, review existing surface conditions, check drainage, access and slopes. This helps us decide whether to overlay existing tarmac/concrete or excavate and install a new sub-base. We’ll bring material and colour samples so you can choose your finish in natural daylight.
Pre-Installation Preparation
Before we arrive on installation day, please clear the area of any potted plants, furniture, or vehicles. Our team protects surrounding surfaces, moves heavy items (when required) and makes sure access is ready. This helps ensure our work is tidy and your life isn’t disrupted.
Base And Edge Preparation
A strong and stable base is essential for long-lasting performance. We excavate if needed, lay and compact a stone sub-base or repair existing concrete/tarmac. We also install edging restraints (block, metal or stone) which serve both structural and visual roles. Without solid edging, movement and edge cracking are common.
Mixing Resin & Aggregates
Once the base is ready, our team mixes the high-quality UV-stable resin binder with natural aggregates in precisely controlled batches. The aggregate size and colour blend influence the finish (e.g., a smooth, slick finish or a textured grip). It is essential to apply the resin during optimal conditions. Once mixed, it can only be used for around 30 minutes (its “pot life”).
Laying The Resin Surface
The mix is poured onto the prepared base, spread evenly and trowelled by hand to the correct thickness. We work systematically to avoid joints, ensure uniform colour, create the correct drainage fall and form a clean border edge. This is the most skill-intensive stage.
Curing & Access Time
Curing time is critical. For most installations, we can allow pedestrian foot traffic after approximately 4–8 hours and vehicle traffic after around 48 hours, provided normal conditions are met. Rain, low temperature or high humidity can lengthen curing time.
Final Inspection & Aftercare
Once the surface has sufficiently cured, we clean the site, inspect the finish, verify the edges and levels, and hand over a comprehensive after-care guide. We also offer a 10-year crack guarantee to provide you with long-term peace of mind.
Typical Timeline For Installing A Resin Driveway In London
Here’s a realistic timeline for a residential driveway size (50–100 m²). Projects vary depending on size, base condition, weather, and access.
- Day 1: Full dig-out (typically 250–300 mm) and removal of spoil off-site.
- Day 2: Sub-base preparation and build-up to the desired level (MOT-type stone compacted to specification).
- Day 3: Edging installation and final levelling of the MOT sub-base to ensure correct falls and levels.
- Day 4: Powering (mixing) and trowelling (laying the resin surface).
- Day 5: Foot traffic permitted.
- Vehicle traffic: Generally permitted after approximately 3 days from laying.
For larger or more complex jobs (commercial sites, steep slopes, many curves), the timeline may extend to 3-5 days or more.
Advantages Of Choosing Professional Resin Driveway Installation
- Durability and lifespan: A correct installation provides a surface that lasts 15-20+ years with minimal maintenance.
- Permeability & drainage: Our resin systems are fully porous, facilitating surface water drainage and compliance with SuDS.
- Bespoke appearance: A wide choice of colours, blends, and edging options means your driveway complements your home perfectly.
- Low maintenance: No loose chippings, fewer weeds, easily cleaned, perfect for busy London homes.
Why Resin Bound London Should Be Your Preferred Installer
At Resin Bound London, we genuinely live by the promise: “Quality isn’t just a promise; it’s written into every surface we lay.”
From the moment we visit your property at 76 Edgecoombe, South Croydon (CR2 8AB) through to the final inspection, we deliver transparency, premium materials (brands such as VUBA and Ox Resin), a 10-year crack guarantee and responsive aftercare.
Whether you’re after a sleek, contemporary look or one that matches the timeless style of a period home, we bring local expertise and hands-on craftsmanship to every project.
Conclusion
If you’re ready to upgrade your driveway, improve your kerb appeal, and get a durable, low-maintenance surface that’s built to last, now’s the time to act. Our team at Resin Bound London is ready to guide you through the process, provide a free on-site quote, and schedule your installation with minimal disruption.
Call us on 0808 281 6614 or email us at [email protected].
Let’s transform your property with a stunning resin driveway installation done right from survey to flawless finish.
FAQs
Q1. How soon can I use my driveway after the install?
Foot traffic is typically safe after 4–8 hours; vehicles after about 48 hours, depending on weather and base preparation.
Q2. Do you always need to remove the old driveway?
Not always. If the existing base (concrete/tarmac) is stable, we can overlay it. However, if it’s cracked, uneven, or drains poorly, a full excavation may be necessary.
Q3. How long will the resin driveway last?
With proper installation and maintenance, your resin driveway should last 15-20 years (or more). The combination of base prep, materials and good laying is key.
Q4. What if the weather is bad during installation?
Resin-bound systems need dry, stable conditions. Rain, frost, or high humidity may delay installation or alter curing time. We’ll plan accordingly and advise.
Q5. Does your installation affect drainage or planning permission?
Our systems are permeable, helping surface water to drain through this, which can ease compliance with SuDS. We check local regulations as part of the site assessment.